Company
HEBEI CHENGSEN
Shijiazhuang, Hebei · China
Packaging supply and customisation
HEBEI CHENGSEN IMP & EXP CO., LTD. supplies glass, plastic, airless and jar packaging. One team coordinates containers, closures and brand customisation.
Explore the collections ↗Details.
Considered together.
Agree on format, material, colour and finish, then coordinate samples, protective packing and shipment.
Start a conversation ↗Packaging systems
Airless systems
RAYMATES twist-lock bottles, double-wall acrylic packs, airless cream jars, lip-mask jars and mono-material refillable bottles.
High-clarity glass
Heavy-base essential-oil droppers, FEA15 fragrance atomisers, aluminium-sleeved droppers, cream jars and borosilicate fragrance vessels.
Functional plastics
PET / PETG bottles, personal-care pumps, foaming bottles, travel sprayers, cream jars and barrier cosmetic tubes.
Aluminium packaging
Aluminium bottles, tins, collapsible tubes and customised tinplate containers, matched to capacity, finish and application.
Closures & outer packaging
Pumps, atomisers, droppers, colour-matched caps, bamboo and wood caps, seals and printed cartons, coordinated as one pack.
Manufacturing & quality
Facility area
12,000 m²
Injection machines · 90–250T
10
Blow-moulding machines · 14 automatic
21
Monthly capacity: 1.8–2.5 million sets
180–250 万
Moulds developed per month
25–35
Stated mould-machining precision
±0.02 mm
Core assembly cleanroom classification
Class 7
Injection and printing area classification
Class 8
First-off inspection
Compare the first pieces of each shift with approved samples for dimensions, appearance and colour.
In-process inspection
The stated protocol samples 30 pieces every two hours to check appearance and process consistency.
Assembly & function
Air cleaning before assembly, followed by neck-gauge, torque, vacuum-seal and pump-function checks.
Traceability & retained samples
Record material lots, dimensions and test data, retaining 10–20 finished sets per batch for a stated minimum of 24 months.
Company-supplied information. Confirm capacity, MOQ and lead times for your project.
The supporting documents.
03 / ARCHIVECertificates & test reports
Download source documents ↓Refer to each original for product scope, applicant and date.


